Due to the different behavior of single-arm and dual-arm cluster tools, it is challenging to schedule a hybrid multi-cluster tool containing both of them. This paper aims to find an optimal one-wafer cyclic schedule for such a multi-cluster tool. It is assumed that the bottleneck individual cluster tool in it is process-bound, thereby making it process-dominant. To do so, this paper models a hybrid multi-cluster tool with Petri nets. With this model, it derives the conditions under which individual cluster tools can operate in a paced way. Based on these conditions, this paper shows that for any process-dominant hybrid multi-cluster tool there is always a one-wafer cyclic schedule. Then, it develops the algorithms to find the minimal cycle time and the optimal one-wafer cyclic schedule. It is computationally efficient and easy-to-implement in practice. Examples are given to show the application and effectiveness of the proposed method.
No takes yet. Share an insight, caveat, or question.
Yang et al. (2014) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: