Discussion is presented of the results of an analog computer study which was conducted to determine the switching surge transients on the planned 500-kV Southern California Edison Company system and to find a means to limit them to a magnitude which would give economic design parameters for the system.
No takes yet. Share an insight, caveat, or question.
Sabath et al. (1966) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: