This paper describes a practical method for setting safety lead-times for purchased components in assembly systems with uncertainty in the supply process. The approach is specifically designed to be used in an MRP procurement environment. A two-stage production model in which suppliers were uncapacitated with stochastic lead times was developed. Then, a combinatorial optimization method that took advantage of structural properties was developed to produce an optimal integer solution of safety lead-times. In addition to yielding a practical lead-time setting tool, the model led to some interesting policy insights: (1) the flexibility achieved by bringing parts in early may have value even in situations with ideal suppliers; (2) purchasing components in batches offers some of the same protection as does safety lead time, but is less precise and subsequently more expensive; and (3) ignoring the complicating issues of MRP procurement results in far from optimal results.
No takes yet. Share an insight, caveat, or question.
Hegedus et al. (2001) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: