Answers are grounded in this paper and cite their sources.
Control charts are used widely to distinguish between random and assignable causes of variation in the process, i.e., they are used to monitor for permanent shifts in the process. However, a control chart does not indicate the exact time when such a shift occurs. Since a shift in the process usually occurs much earlier before it is detected, the search for the assignable cause could be quite difficult. The search depends on the process engineers’ experience and knowledge of the process. This article discusses an approach based on the work of Samuel et al. (see Samuel, T. R., Pignatiello, J. J. Jr., Calvin, J. A. (1998 Samuel, T. R., Pignatiello, J. J. Jr. and Calvin, J. A. 1998. Identifying the time of a step change with [Xbar] control charts. Quality Engineering, 10(3): 521–527. [Taylor & Francis Online] , [Google Scholar]). Identifying the Time of a Step Change with [Xbar] Control Charts. Quality Engineering, 10(3):521–527.) to identify the time of a permanent shift in the mean of a process with CUSUM control charts.
No takes yet. Share an insight, caveat, or question.
Michael B. C. Khoo (2004) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: