When evaluating a fully probabilistic risk assessment, say at a hazardous waste site, the risk manager needs a risk management policy that distinguishes an acceptable distribution of risk from an unacceptable one. This manuscript explores several alternative ways to define the acceptability of a distribution of risk. This manuscript also presents methods to backcalculate distributions for cleanup targets under the alternative risk management policies if the need arises.
No takes yet. Share an insight, caveat, or question.
Burmaster et al. (1995) studied this question.
Synapse has enriched 2 closely related papers on similar clinical questions. Consider them for comparative context: