In semiconductor manufacturing, finding an efficient way for scheduling a multicluster tool is critical for productivity improvement and cost reduction. This two-part paper analyzes optimal scheduling of multicluster tools equipped with single-blade robots and constant robot moving times. In this first part of the paper, a resource-based method is proposed to analytically derive closed-form expressions for the minimal cycle time of two-cluster tools. We prove that the optimal robot scheduling of two-cluster tools can be solved in polynomial time. We also provide an algorithm to find the optimal schedule. Examples are presented to illustrate the proposed approaches and formulations.
No takes yet. Share an insight, caveat, or question.
Chan et al. (2010) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: