Performance measurement has become conventional in construction management. However, it is non-trivial to establish an effective system to capture, evaluate, and feedback the on-site data. Whilst 3D object–based technology prevails in the industry, project managers remain accustomed to text-based system. Unstructured data format requires a tremendous amount of time and effort when analyzing a project in detail. To overcome this issue, an extensive literature review in conjunction with industry feedback has been conducted. Based on this preliminary investigation, the authors have proposed an on-site performance measurement system that interlinks 3D object with a spreadsheet. The system enables project managers to recognize the performance and/or productivity of a project in real time and helps find timely remedies in updating the original plan. One of the key findings includes that the identified eight on-site productivity factors should be embedded into a 3D model in effectively measuring the performance for a particular project. The new system also provides a useful tool in managing the productivity of a project. The main contribution of this study is the proposition and verification of a novel methodology that effectively manages on-site performance information by relating 3D objects with productivity factors in building construction.
No takes yet. Share an insight, caveat, or question.
Cha et al. (2020) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: