Answers are grounded in this paper and cite their sources.
This paper considers the problem of predicting on-time performance on a partially double-tracked rail line with scheduled traffic. In particular, the model presented herein explicitly incorporates the uncertainty in train departure times along with more complex line structures than have been considered previously. Extensive Monte Carlo simulations are used to validate the predictions made by the proposed model under an optimal meet/pass planning process.
No takes yet. Share an insight, caveat, or question.
Hallowell et al. (1996) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: