Answers are grounded in this paper and cite their sources.
One method has been developed for estimating phase-to-phase clearances to withstand switching surge voltages and lightning surges in substations. Consideration has been given to the simultaneous occurrence of opposite polarity switching surges on adjacent phases, and propagating characteristics of lightning surges on the transmission lines.
No takes yet. Share an insight, caveat, or question.
T. Udo (1966) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: