In this paper, we consider the scheduling with step-deteriorating jobs. The objective is to minimize the makespan. We first propose a property of any optimal schedule after analyzing the NP-hardness for the parallel-machine scheduling with a common deteriorating date, and then present a fully polynomial time approximation scheme for the case where the number of machines m is a constant and jobs have anti-agreeable parameters. Furthermore, we show that the single-machine scheduling is NP-hard in the strong sense if jobs have distinct release dates and distinct deteriorating dates.
No takes yet. Share an insight, caveat, or question.
Miao et al. (2018) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: