This paper gives a detailed account of the current practices used in Brazil for probabilistic reliability assessment of the national power grid, from the adequacy point of view. These procedures are utilized by the Brazilian independent electric system operator and were recently made mandatory by the National Electric Energy Regulatory Agency (ANEEL).
No takes yet. Share an insight, caveat, or question.
Schilling et al. (2008) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: