The concept of post-tensioned timber structures has been developed and implemented since 2005. The technology relies on unbonded post-tensioned timber elements to create a moment-resisting connection. After several years of extensive experimental testing, the first buildings were constructed in 2010. Although comprehensive research has been conducted on their behavior under static and dynamic loading, limited data are available about their long-term performance. In particular, there is limited understanding of how to estimate the long-term post-tensioning losses. This paper presents two years of experimental observations on a fully monitored post-tensioned timber building: the House of Natural Resources. Additionally, a numerical approach based on a moisture-dependent viscoelastic model is presented to simulate the post-tensioning trend over time.
No takes yet. Share an insight, caveat, or question.
Granello et al. (2019) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: