The one-TeV proton synchrotron which has been under construction at Fermilab is nearly complete and is now entering the commissioning phase. The assembly and testing of the ring of more than 1000 superconducting magnets with its associated cryogenic, vacuum, power, R.F., controls and safety systems has gone extremely well.
No takes yet. Share an insight, caveat, or question.
John A. Orr (1983) studied this question.