We consider a class of n-job one-machine scheduling problems with ready time r(i), processing time p(i), and due time d(i) for each job i. Preemption is not allowed, and precedence constraints among jobs are not assumed. For this problem we show that there is a 0(n2)-time algorithm to find a schedule that minimizes the number of tardy jobs, under the assumption that r(i) < r(j) implies d(i) ≤ d(j).
No takes yet. Share an insight, caveat, or question.
Kise et al. (1978) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: