Answers are grounded in this paper and cite their sources.
In studies by Errico (2007) and Gelaro et al. (2007), it was found that first order approximations of the reduction of forecast error by the analysis were systematically close to twice the correct value, while higher order approximations lead to relatively accurate estimations. We show that this factor of 2 is due to the quadratic nature of the forecast error measure and to the fact that the analysis point is near the minimum of this quadratic measure.
No takes yet. Share an insight, caveat, or question.
Yannick Trémolet (2007) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: