A spatial scheduling pursues the optimal dynamic spatial layout schedule that also satisfies traditional scheduling constraints. In a shipyard, spatial scheduling problems occur in various working areas, such as block assembly shops, grand block assembly shops, dry docks, and block paint shops. In the literature, a few studies applied the spatial scheduling on the shipbuilding process, but only on the block assembly shop.
No takes yet. Share an insight, caveat, or question.
Park et al. (2002) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: