Flood control detention facilities are widely used for stormwater control in urban areas. Standard design procedures are in most cases based on the design storm approach: a single flood event at a time is considered, at the beginning of which the facility is assumed completely empty. The possibility of pre-filling from previous events is then neglected and underestimation of storage volume may occur. In this paper an analytical probabilistic approach to estimate the probability of pre-filling is presented and its effects, due to outflow rate and storage volume, are investigated. Two different strategies for the outlet control are analysed. Results are validated on a case study.
No takes yet. Share an insight, caveat, or question.
Raimondi et al. (2014) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:
More from Urban Water Journal