Answers are grounded in this paper and cite their sources.
This paper presents a procedure for sequencing a set of jobs on a single processor (machine) with the objective of minimizing the mean flow time, when the jobs may have unequal ready times. The procedure involves implicit enumeration with the branch and bound technique, coupled with some devices to improve the efficiency of the search. The devices include a sufficient optimality condition, a simple but tight lower bound and rules for tree pruning. The approach has potential applications to other sequencing problems.
No takes yet. Share an insight, caveat, or question.
Dessouky et al. (1981) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: