Answers are grounded in this paper and cite their sources.
In this paper, we consider a two-machine flowshop scheduling problem in which the waiting time of each job between the two machines cannot be greater than a certain time period. For the problem with the objective of minimizing makespan, we identify several dominance properties of the problem and develop a branch-and-bound (B&B) algorithm using the dominance properties. Computational tests are performed on randomly generated test problems for evaluation of performance of the B&B algorithm, and results show that the algorithm can solve problems with up to 150 jobs in a reasonable amount of CPU time.
No takes yet. Share an insight, caveat, or question.
Joo et al. (2008) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: