This paper presents a water-level control system for the Meuse river, the implementation of which is planned to start in 1997. A simplified model is used for the tuning of and design of the controllers. To obtain a highly reliable control system, a decentralized control structure is used. The control system has been tested extensively in computer simulations, the test results of which are shown.
No takes yet. Share an insight, caveat, or question.
Schuurmans et al. (1997) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: