Up to now, within the design/retrofit of wastewater treatment plants (WWTPs), deterministic models were used to evaluate different scenarios on their merits in terms of effluent compliance. This paper describes an approach in which a Monte Carlo engine is coupled to a deterministic treatment plant model, followed by risk interpretation in the form of concentration-duration-frequency (cdf) curves of norm exceedance. The combination of probabilistic modelling techniques with the currently available deterministic models allows to determine the probability of exceeding the effluent limits of a WWTP. This percentage of exceedance is accompanied by confidence intervals resulting from the inherent uncertainty of influent characteristics and model parameters. The approach is illustrated for a hypothetical case study, consisting of a denitrifying plant model inspired by the benchmark model described by Spanjers et al.
No takes yet. Share an insight, caveat, or question.
Rousseau et al. (2001) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: