We study a multi-scenario scheduling problem on a single-machine and a two-machine flow-shop system. The criterion is to maximise the weighted number of just-in-time jobs. We first analyze the case where only processing times are scenario-dependent. For this case, we prove that the single-machine problem is solvable in polynomial time. We also prove that the unit weight two-machine flow-shop problem is solvable in polynomial time if processing times are scenario-dependent only on the second machine, and is ordinary NP-hard when processing times are scenario-dependent only on the first machine. This ordinary NP-hard result holds as long as the number of scenarios is fixed. Otherwise, the problem becomes strongly NP-hard. We then analyze the case where only weights are scenario-dependent. We adopt a multi-criteria approach and define several problem variations. We prove that one of them is polynomial solvable on a single machine and ordinary NP-hard in a two-machine flow-shop system. We also prove that all other problem variations are ordinary NP-hard even if there are only two scenarios, and are strongly NP-hard when the number of scenarios is arbitrary. Finally, we provide two pseudo-polynomial time algorithms for solving all the hard problems when the number of scenarios is fixed.
No takes yet. Share an insight, caveat, or question.
Gilenson et al. (2019) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: