Answers are grounded in this paper and cite their sources.
This paper presents a multi-period probabilistic production cost model. Dispatch intra-period and inter-period constraints are considered through the use of a facet LP formulation. An efficient solution procedure based on the Dantzig-Wolfe decomposition technique is developed. The work reported in this paper extends previous work in two respects: (i) inter-period constraints are rigorously treated, and (ii) a systematic general solution procedure is developed. Results for a large-scale case study are presented.
No takes yet. Share an insight, caveat, or question.
Pérez‐Ruiz et al. (2000) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: