In this paper, we estimate how quickly and how precisely a reactor’s operational status and thermal power can be monitored over hour to month time scales, using the antineutrino rate as measured by a cubic meter scale detector. Our results are obtained from a detector we have deployed and operated at 25m standoff from a reactor core. This prototype can detect a prompt reactor shutdown within 5h and monitor relative thermal power to within 7days. Monitoring of short-term power changes in this way may be useful in the context of International Atomic Energy Agency’s reactor safeguards regime or other cooperative monitoring regimes.
No takes yet. Share an insight, caveat, or question.
A 2008 study studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: