The problem of scheduling n jobs on m parallel machines is considered when the machines are subject to random breakdowns and job processing times are random variables. An objective function of mean flow time is developed for a general parallel machine system, and an expression of its expected value is derived. The problem is transformed into a deterministic unrelated parallel machine scheduling model with modified processing times when the number of breakdowns is modeled as a generalized Poisson process.
No takes yet. Share an insight, caveat, or question.
Allahverdi et al. (1994) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: