Answers are grounded in this paper and cite their sources.
The Shewhart X chart (or X chart) is widely used to monitor the mean of a quality characteristic x. This chart decides the process status based on the magnitude of the sample mean x and is effective for detecting large mean shifts. The synthetic chart is also a Shewhart type chart for monitoring the process mean, but it utilises the information about the time interval between two nonconforming samples. Here a sample is nonconforming if its x value falls beyond the predetermined warning limits. Unlike the X chart, the synthetic chart is more powerful to detect small shifts. The applications of the X and synthetic charts cover a wide variety of manufacturing processes and production lines, e.g., the monitoring of the mean values of the inside diameter of a piston-ring, the viscosity of aircraft paint, the resistivity of silicon wafers. This article proposes a combined scheme, the Syn-X chart, that comprises a synthetic chart and an X chart. The results of the performance studies show that the Syn-X chart always outperforms the individual X chart and synthetic chart under different conditions. It is more effective than the X chart and synthetic chart by 47% and 20%, respectively, over the wide range of mean shift values in different experiment runs.
No takes yet. Share an insight, caveat, or question.
Wu et al. (2010) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: