The important practical problem of planning the production of large assemblies employing an MRP-based system is considered. The objective is to produce products on-time, with minimal cycle time and low work-in-process costs. The approach is based on the determination of accurate lead-time estimates and on the introduction and use of lead-time offsets in the solution methodology. An effective Lead-time Evaluation and Scheduling Algorithm (LETSA) is employed that can perform detailed backward scheduling of operations belonging to a large assembly on a given facility with an objective of minimizing the cycle time. A scaling procedure is used to account for capacity sharing effects by multiple products in a common facility. These scaled lead-time estimates are then employed by an MRP-based system to release work-orders on the shop-floor. The effectiveness of these lead-times and lead-time offsets are evaluated by simulating production using the MRP generated order release times and verifying on-time completion of the multiple assemblies in the common facility. Numerical experiments are presented to validate the performance of the approach. Optimized batch sizes for minimal work-in-process (WIP) costs can also be obtained using LETSA. Thus, the important objectives of minimizing cycle time for on-time delivery and minimizing schedule costs can be accomplished simultaneously.
No takes yet. Share an insight, caveat, or question.
Agrawal et al. (2000) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: