The problem of scheduling jobs with non-identical capacity requirements or sizes on a single batch processing machine to minimize total completion time and makespan is studied. These problems are proven to be NP-hard and heuristics are developed for both, as well as a branch and bound algorithm for the total completion time problem. Computational experiments show that the heuristics are capable of rapidly obtaining near-optimal solutions.
No takes yet. Share an insight, caveat, or question.
Reha Uzsoy (1994) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: