This is the authors' abstract. We don't add key points for this paper.
This paper is a complete survey of flowshop-scheduling problems and contributions from early works of Johnson of to recent approaches of metaheuristics of 2004. It mainly considers a flowshop problem with a makespan criterion and it surveys some exact methods (for small size problems), constructive heuristics and developed improving metaheuristic and evolutionary approaches as well as some well-known properties and rules for this problem. Each part has a brief literature review of the contributions and a glimpse of that approach before discussing the implementation for a flowshop problem. Moreover, in the first section, a complete literature review of flowshop-related scheduling problems with different assumptions as well as contributions in solving these other aspects is considered. This paper can be seen as a reference to past contributions (particularly in n/m/p/c max or equivalently F/prmu/c max) for future research needs of improving and developing better approaches to flowshop-related scheduling problems.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Hejazi et al. (2005) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: