We are approximately half-way through the construction phase of the superconducting booster linac. Contracts have been placed for all major items, and many of these have been delivered. The high-beta resonator development has been successful and we are going ahead with construction of these.
No takes yet. Share an insight, caveat, or question.
Amsbaugh et al. (1986) studied this question.