Answers are grounded in this paper and cite their sources.
The paper reports on commissioning of the converter control and protection of the Nelson River HVDC Bipole 2, stage 1. Control and protection experience of the first year of commercial operation is also presented. Importance of extensive simulator studies during the design stage and also during commissioning is pointed out
No takes yet. Share an insight, caveat, or question.
Mazur et al. (1981) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: