Answers are grounded in this paper and cite their sources.
We have carried out an engineering study with the aim of enhancing the reliability of the starting system of the salient-pole synchronous machines in a pumping-generating plant. We focused on accurate prediction of the damper bar currents, electromagnetic torque, acceleration time, and bar temperatures during the starting process. We used the time-stepping finite-element analysis (FEA) for a multiple-pole model including coupled field-circuit formulation and rotor motion. We also developed an analytical model, incorporating the equivalent circuit parameters, to simulate the starting performance of the generator/motor units. The predicted results from both the FEA model and the analytical model agree well with experimental investigations. As a result, we were able to propose a way to improve the motor's reliability and allow many additional starts.
No takes yet. Share an insight, caveat, or question.
Karmaker et al. (2004) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: