In this paper, we present the results of an economic feasibility study and propose a system structure to test and maintain electrical stability. In addition, we present real operation results after constructing a remote microgrid on an island in South Korea. To perform the economic feasibility study, a commercial tool called HOMER was used. The developed remote microgrid consists of a 400 kW wind turbine (WT) generator, 314 kW photovoltaic (PV) generator, 500 kVA × 2 grid forming inverter, 3 MWh lithium ion battery, and an energy management system (EMS). The predicted renewable energy fraction was 91% and real operation result was 82%. The frequency maintaining rate of the diesel power plants was 57% but the remote microgrid was 100%. To improve the operating efficiency of the remote microgrid, we investigated the output range of a diesel generator.
No takes yet. Share an insight, caveat, or question.
Chae et al. (2015) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: