Answers are grounded in this paper and cite their sources.
This paper considers the scheduling problem of minimizing the weighted number of early and tardy jobs on identical parallel machines, Pm||∑wj(Uj + Vj). This problem is known to be NP complete and finding an optimal solution is unlikely. Six meta-heuristics including hybrids are proposed for solving the problem. The meta-heuristics considered are genetic algorithm, particle swarm optimization and simulated annealing with their hybrids. A comparative study that involves computational experiments and statistical analysis are presented evaluating these algorithms. The results of the research are very promising.
No takes yet. Share an insight, caveat, or question.
M. O. Adamu (2013) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: