In this paper, we take the four-way shuttle system as the research object and establish the mathematical model of scheduling optimization based on the minimum time for the in/out operation optimization and path optimization scheduling problems of the four-way shuttle system. An improved genetic algorithm is used to solve the task planning, and an improved A* algorithm is used to solve the path optimization within the shelf level. The conflicts generated by the parallel operation of the four-way shuttle system are classified, and the improved A* algorithm based on the time window method is constructed for path optimization through the dynamic graph theory method to seek safe conflict-free paths. Through simulation example analysis, it is verified that the improved A* algorithm proposed in this paper has obvious optimization effect on the model of this paper.
No takes yet. Share an insight, caveat, or question.
Mao et al. (2023) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: