In this paper, we present a non-linear binary programing for optimizing a specific cost in cellular manufacturing system in a controlled production condition. The system parameters are determined by the continuous distribution functions. The aim of the presented model is to optimize the total cost of imposed sub-contractors to the manufacturing system by determining how to allocate the machines and parts to each seller. In this system, DM could control the occupation level of each machine in the system. For solving the presented model, we used the electromagnetic meta-heuristic algorithm and Taguchi method for determining the optimal algorithm parameters.
No takes yet. Share an insight, caveat, or question.
Shahriari et al. (2016) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: