Two shortest route models for determining where to allocate inspection effort on a production line are developed for the cases where this effort is unlimited or limited in its availability. A production line is defined as an ordered sequence of production stages, each stage consisting of a manufacturing operation followed by a potential inspection station. Items flow through the line in batches and may incur defects at any stage. Defects are assumed to be repairable or non-repairable. The defect generating process at any stage is taken to be an independent Bernoulli process with a known parameter. Two levels of inspection effort may be applied at any stage: no inspection or 100% inspection. Thus, both models are used to determine the stages at which batches are to be 100% inspected. A general cost structure is postulated first for the case where items with repairable defects are immediately repaired and items with non-repairable defects are discarded, and then for the case where all items found to be defective are replaced immediately with non-defectives. An expected cost per batch criterion is used to determine an optimal inspection plan in all cases. Examples are included.
No takes yet. Share an insight, caveat, or question.
Leon S. White (1969) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: