Answers are grounded in this paper and cite their sources.
Industrial systems often have redundant structures for improving reliability and avoiding sudden failures, and a parallel system is one of the special redundant systems. In this paper, we consider the problem of reliability estimation for a parallel system when one stress variable is involved, which is called the multicomponent stress-strength model. The parallel system contains two components, and their joint lifetime follows a Marshall–Olkin bivariate Weibull distribution, while the stress variable is assumed to be the Weibull distribution. Due to the complicated form of the likelihood function, a data augmentation method is proposed, and then the Gibbs sampling algorithm is constructed to obtain the Bayesian estimation of the system reliability. The proposed method is evaluated by a simulated dataset and Monte Carlo simulation study. The simulation results show that the proposed method performs well in terms of relative bias, mean squared error and frequentist coverage probability.
No takes yet. Share an insight, caveat, or question.
Zhang et al. (2022) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: