We consider here the inventory replenishment policy over a fixed planning period for a deteriorating item having a deterministic demand pattern with a linear trend and shortages. The number of reorders, the interval between two successive reorders and the shortage intervals over a finite time-horizon are all determined in an optimal manner so as to keep the average system cost to a minimum. One numerical example illustrates how the procedure works. The counterpart of this example in the no-shortage case is also given. The effects of variation in the deterioration rate on the optimal policy are also indicated with numerical examples.
No takes yet. Share an insight, caveat, or question.
Goswami et al. (1991) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: