An investigation was conducted to determine the root cause of the premature pavement failure. The premature pavement failure occurred in the form of rutting and alligator cracking. Although the affected portion was repaired by removing and replacing the top 75-mm asphalt concrete (AC), the repaired AC experienced recurring rutting and alligator cracking in a few weeks. Through extensive field and lab testing, it was found that the weak base is the root cause of the premature failure and the brittleness of the AC is secondary. However, both the base and AC were built according to plan and met the current material and field density requirements. It was concluded that density alone for construction quality control is not sufficient, as it was not able to protect against premature failures from occurring. Although there are many different ways to minimize premature failures, an immediate action is to include proof rolling in construction quality control. Proof rolling has been used with success to ensure proper compaction and to locate unstable areas, as the stability is greatly influenced by the degree of densification achieved during compaction.
No takes yet. Share an insight, caveat, or question.
Dar‐Hao Chen (2009) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: