Answers are grounded in this paper and cite their sources.
Project managers routinely rely on key performance indicators (KPIs) and statistical process control tools — such as Exponentially Weighted Moving Average (EWMA) and Cumulative Sum (CUSUM) — to monitor project dynamics. Yet evidence on whether structural complexity metrics improve strategic decision quality, rather than merely deviation detection, remains scarce. This paper presents an exploratory controlled between-subjects experiment evaluating the decision-quality impact of the Systemic Complexity Index (SCI), a curvature-based metric derived from Riemann–Christoffel tensor formalism, against KPI-only, KPI+EWMA, and KPI+CUSUM information conditions. Thirty-two human professionals and 8 large language models (LLMs) evaluated four decision scenarios derived from real project data (256 observations total), with decision quality operationalized through the Decision Quality Index (DQI). KPI+SCI was the only condition producing a statistically distinguishable improvement, with large effect sizes in both LLMs (d=2.716) and humans (d=1.055, DQI=+0.172 humans, +0.155 AI), driven exclusively by Causal/Structural Alignment and operating through a mediated pathway — systemic comprehension fully mediates the effect in humans and partially in LLMs. Fisher Z meta-analysis across five independent projects yields r=0.767 (95% CI [0.44, 0.91], I ), establishing the preliminary SCI’s predictive evidence and positioning it as a potential structurally unique complement to conventional monitoring tools, offering decision-making value precisely where statistical process control methods are limited.
No takes yet. Share an insight, caveat, or question.
Peris et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: