This paper investigates the integration of planning and scheduling theory for open-pit ore mining industry under comprehensive mining constraints and attributes. Consequently, mine design planning, mine block sequencing and mine production scheduling problems are modelled, solved, interacted and integrated in a whole system. A series of interrelated mixed integer programming models and hybrid solution approaches are developed. Based on a real-world case study, it is validated that the integration of mathematical models is promising to significantly improve the overall efficiency of mining management in an analytical way.
No takes yet. Share an insight, caveat, or question.
Liu et al. (2017) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: