We consider the classical two-machine flowshop sequencing problem with the following additional constraint. When a job is completed on the first machine it must be transported to the second machine; a single transporter is available. A completed job on the first machine will block the machine if the transporter is in transit. A constructive algorithm to minimize makespan is presented in the paper.
No takes yet. Share an insight, caveat, or question.
S. S. Panwalkar (1991) studied this question.