An improved pedestrian delay model was developed for signalized intersections with a two-stage crossing design. This model provides a timely enhancement tool for the Highway Capacity Manual for conducting multimodal-oriented level of service assessments at signalized intersections with unconventional pedestrian crossings. The proposed model is presented in a general form that provides estimation of three portions of pedestrian delay involved in a two-stage crossing: the first-stage delay; the second-stage delay for pedestrians who crossed during the Walk phase of the first stage; and the second-stage delay for pedestrians who crossed during the flashing Don't Walk and Stop phases of the first stage. The model was validated through microscopic simulation under a wide range of traffic scenarios. Statistical analysis suggests that the proposed model is able to give satisfying results (R 2 = 99.9%, p-value = .000). The model can be applied in various cases knowing some basic input parameters and variables.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2010) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: