Thermostatically controlled loads (TCLs) can respond rapidly to frequency disturbances, but fast modulation alone does not establish firm primary-frequency reserve. This study develops a readiness framework that links evidence synthesis, probabilistic reserve sizing, post-event recovery and feeder-level compatibility. A focused review of 74 journal studies informed a two-stage simulation framework. Stage A combined deterministic stress testing, 300-realization Monte Carlo sizing and an independent capacity-hold verification, while Stage B embedded this independently simulated profile in an 8500-node benchmark distribution feeder. The realistic aggregation remained frequency-responsive, but operational constraints produced substantial nominal-to-firm derating. For the modeled upward-reserve case, under the assumed population distributions and operating conditions, an empirical declaration of 0.885 MW achieved approximately 95% joint compliance, while only 56.35% of event-state nominal upward flexibility was firm in the independent verification. Recovery remained distinct from delivery readiness, and feeder analysis showed that an aggregate-compliant profile could still create local voltage and loading violations. The results show that credible TCL reserve requires reliability-conditioned derating, explicit recovery assessment and feeder-specific qualification rather than reliance on nominal flexibility or response speed alone.
No takes yet. Share an insight, caveat, or question.
Torreglosa et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: