We consider a two-echelon serial inventory system with demand and supply uncertainty, non-zero lead times for component procurement and end-product assembly, and a minimum customer service level requirement. We present two supply models which incorporate both quantity and timing uncertainty; these models correspond to current and proposed supply environments. Assuming that installation base-stock ordering policies are followed and that the demand distribution is quasi-concave, we show that the chance-constrained problem of determining optimal base-stock levels which minimize the total inventory investment (cost-weighted stock levels) subject to a service constraint is a convex programming problem. We characterize the relation between the optimal base-stock levels of the component and the end-product. We also illustrate how an optimal internal (component) service level can be computed, which permits decomposition of the two-stage serial system into two coordinated single-echelon systems. Computational experiments illustrate insights on the effects of supply uncertainty and other problem parameters on stock-positioning in a two-echelon serial system. In particular, we evaluate the benefits of switching from one supply environment to another.
No takes yet. Share an insight, caveat, or question.
Bollapragada et al. (2004) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: