Answers are grounded in this paper and cite their sources.
This paper presents the technical, financial, and environmental impact assessment of a 50-MW (MW) utility-scale wind farm in Ghana at four locations: Anloga, Atiteti, Sege, and Denu. The monthly average wind speeds recorded at the locations were 6.01 m/s, 5.98 m/s, 5.46 m/s, and 5.17 m/s respectively at 60 m above ground level. Capacity factors of 24.9%, 24.4%, 20.6%, and 18.0% were obtained at the locations respectively. The Net Present Value (NPV) was the main financial metric employed to determine the viability of the projects. The results indicated that a potential utility-scale wind project is viable at all locations under study. Furthermore, the Electricity Exported to the Grid and the Electricity Export Rate (EER) had the highest impact of 0.63 and 0.62 on the NPV respectively and therefore these key parameters should be well considered before any potential project implementation.
No takes yet. Share an insight, caveat, or question.
Asamoah et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: