We describe a simple modification of Palmer's heuristic for scheduling jobs in a flow shop. While the additional computation required is relatively small, the performance of the algorithm compares very well with that of the more sophisticated and better algorithm of Campbell, et al. (1970) at a fraction of the effort required by the latter.
No takes yet. Share an insight, caveat, or question.
Hundal et al. (1988) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: