The pure flowshop scheduling problem is here investigated from a perspective considering me uncertainty associated with the execution of shop floor activities. Being the flowshop problem is NP complete, a large number of heuristic algorithms have been proposed in literature to determine an optimal solution. Unfortunately, these algorithms usually assume a simplifying hypothesis: the problem data are assumed as deterministic, i.e. job processing times and the due dates are expressed through a unique value, which does not reflect the real process variability. For this reason, some authors have recently proposed the use of a fuzzy set theory to model the uncertainty in scheduling problems. In this paper, a proper genetic algorithm has been developed for solving the fuzzy flowshop scheduling problem. The optimisation involves two different objectives: the completion time minimisation and the due date fulfilment; both the single and multi-objective configurations have been considered. A new ranking criterion has been proposed and its performance has been tested through a set of test problems. A numerical analysis confirms the efficiency of the proposed optimisation procedure.
No takes yet. Share an insight, caveat, or question.
Celano et al. (2003) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: