Answers are grounded in this paper and cite their sources.
Kepner-Tregoe decision analysis was formally used as an aid to route selection, as outlined in the preceding paper. Over 40 paper routes were assessed for suitability for both immediate and longer term manufacture of AZD7545, a compound in the early stages of development. Eight routes were then investigated in full in the laboratory, and a further four in part, over a period of 3−4 months. From this exercise, the preferred long-term manufacturing route was identified before the first pilot scale manufacture had been completed. This route selection exercise worked well in this case where a large number of potential routes had to be considered using limited resources. It was also an effective means of bringing some long-term manufacturing issues to the fore at an early stage in development.
No takes yet. Share an insight, caveat, or question.
Moseley et al. (2008) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: